Langill Farm Multi-Family Development

Project Details:

  • Full site development with sewer, water, LDS and road construction
  • 126 single family residential lots
  • 4 commercial lots, 16 multi-family services
  • Park Road West Reconstruction, 4-lane concrete paved construction
  • 2.4m x 1.8m concrete box culverts, and 1.65m, & 1.5m diameter concrete LDS
  • Retention pond excavation
  • 14,100m of pipe (14.1 km) installed on this project

Hampton Village

Project Details:

  • Road construction
  • Full site development with sewer, water, LDS and road construction
  • 34 single family residential lots
  • Retention pond excavation
  • Concrete swale bottom
  • Double runs of 750 concrete LDS
  • Large greenspace graded and seeded/sodded (35,000 m²)

Heritage Park

  • Multi-family Residential
  • Road Construction
  • Sewer construction
  • Land drainage sewer construction
  • Retention pond
  • Road construction
  • House and barn demolition
  • Lagoon decommissioning and cleanup
  • 12 large single family lots
  • 7 duplex lots
  • 6 commercial lots

Acres Drive

  • Road construction
  • 550M of concrete slip form street

Freightliner Parking Lot

  • Sewer and water service installation
  • Parking lot construction
  • Strip topsoil from whole site
  • Supply and install limestone for building in-fill
  • Supply and install local gravel for parking lot (20,000 tonne)

West St. Paul Multi-Family Development

Project details:

  • Multi-Family Development composed of 139 units in 17 buildings
  • Sewer, water, land drainage sewer
    • 6.5m deep sewer connection
    • Pipe sizes ranging from 50mm HDPE to 1350mm Reinforced concrete pipe
  • River outfall with concrete gate chamber
  • Road/Parking lot construction
  • Building excavation and backfill

Manning Canal Culvert Installations

Project Details:

  • Remove 23 culverts, sizes varying from 12″ to 48″
  • Install 22 through dike culverts, sizes varying from  24″ – 48″
  • Supply and install stone rip-rap for erosion control
  • Restore and re-seed dike genericforgreece.com

1466 Templeton Avenue

Project Details:

  • A Habitat for Humanity project
  • Sewer main and service installation
    • 5.68 meter deep sewer connection (18.6′)
  • Water service connections
  • Land drainage sewer
  • Road construction

Deer Ridge Estates

This project included the construction of a new roadway for an acreage development.

Project Details:

  • Strip topsoil and stockpile outside of road right of way
  • Excavate for roadway and ditches
  • Supply and install road gravel
  • Supply and install asphalt pavement
  • Disc and dry stripped topsoil
  • Re-use topsoil and level it in new ditches