Deer Ridge Estates
Grande Pointe, MB | 2020
This project included the construction of a new roadway for an acreage development.
Project Details:
- Strip topsoil and stockpile outside of road right of way
- Excavate for roadway and ditches
- Supply and install road gravel
- Supply and install asphalt pavement
- Disc and dry stripped topsoil
- Re-use topsoil and level it in new ditches