Deer Ridge Estates

Grande Pointe, MB | 2020

This project included the construction of a new roadway for an acreage development.

Project Details:

  • Strip topsoil and stockpile outside of road right of way
  • Excavate for roadway and ditches
  • Supply and install road gravel
  • Supply and install asphalt pavement
  • Disc and dry stripped topsoil
  • Re-use topsoil and level it in new ditches