Hampton Village
Steinbach, MB | 2023
Project Details:
- Road construction
- Full site development with sewer, water, LDS and road construction
- 34 single family residential lots
- Retention pond excavation
- Concrete swale bottom
- Double runs of 750 concrete LDS
- Large greenspace graded and seeded/sodded (35,000 m²)
