Langill Farm Multi-Family Development
Steinbach, MB | 2023
Project Details:
- Full site development with sewer, water, LDS and road construction
- 126 single family residential lots
- 4 commercial lots, 16 multi-family services
- Park Road West Reconstruction, 4-lane concrete paved construction
- 2.4m x 1.8m concrete box culverts, and 1.65m, & 1.5m diameter concrete LDS
- Retention pond excavation
- 14,100m of pipe (14.1 km) installed on this project
