Langill Farm Multi-Family Development

Steinbach, MB | 2023

Project Details:

  • Full site development with sewer, water, LDS and road construction
  • 126 single family residential lots
  • 4 commercial lots, 16 multi-family services
  • Park Road West Reconstruction, 4-lane concrete paved construction
  • 2.4m x 1.8m concrete box culverts, and 1.65m, & 1.5m diameter concrete LDS
  • Retention pond excavation
  • 14,100m of pipe (14.1 km) installed on this project